CCS Type2 Fast Charging Kit

Price:

£ 3,300.00


LG Battery Module 12 Pin Connector With Pins
LG Battery Module 12 Pin Connector With Pins
£ 3.41
£ 3.41

CCS Type2 Fast Charging Kit

https://shop.fellten.com/web/image/product.template/13491/image_1920?unique=a89c16b

£ 3,300.00 3300.0 GBP £ 3,300.00

£ 3,300.00


    This combination does not exist.

    Terms and Conditions

    UK Next Day Delivery  - Excluding Weekends and Bank Holidays.

    Worldwide Shipping
    30 Days Return
    Fast Delivery


    Share :

    Kit contains:

    • CCS Type2 socket with 3 metre AC tails.
    • 6 Meters of 70mm HV Cable
    • CCS controller
    • Two contactors
    • Connectors and Pins for wiring your own loom.
    • CCS VCU.
    • Indication light with release button.
    • Charge port locking solenoid.

     

    Our CCS controller is designed to be mounted within the high voltage (HV) battery box along with the two contactors it can also control your main HV contactors and precharge.

    The kit has been fully field tested and meets all CCS charging standards.

    Manual for installation and configuration can be found in the documents tab.

    Most CCS chargers will not charge battery packs below 200v.

    Design for use with Orion BMS only please contact us if using a different BMS.


    Porsche 911 Conversion CCS Example:

    52.8 kWh Battery

    350v Nominal Voltage

    Type 2 AC Charging:

    Using Onboard 6.6kw Elcon charger, charging at 6kw to account for efficiency and losses.

    Charge from 10-90% SOC: 42.2 kWh

    Time taken to charge: 7hrs

    DC Fast Charging:

    Adjusted for battery voltage, theoretical max charge power: 70 kW

    Charge from 10-90% SOC: 42.2 kWh

    Time taken to charge: 40 minutes.

    *Based on ideal operating conditions. Real world numbers may differ slightly.

    Example Trip

    280 mile trip from London to Newcastle.

    Start with 100% SOC, end with 10% SOC.

    Consumption: 250 Wh/m

    Type 2 AC Charging:

    10hrs spent charging + 5hr 30 trip time = 15hr 30min total trip duration = impractical

    DC Fast Charging:

    50 Minutes spent charging + 5hr 30 trip time = 6hr 20 min total trip duration

     



    Current CCS Type 1 & 2 User Guide Fellten V 1.3.pdf
    Download
    H2_MAIN_HARNESS_H2_MAIN_HARNESS_3_1708330124_170833012413490.pdf
    Download
    CONTACTOR_CONTROLLER_HARNESSES_CCSCCHVSL_3_1708330180_170833018050754.pdf
    Download
    Accessory Products